Smith College, MA embarks on $220-million geothermal project
ThinkGeoEnergy
OCTOBER 31, 2023
The geothermal project is expected to be completed by 2028, towards achieving carbon neutrality by 2030. A series of wells at a depth of 800 feet (~243 meters) will be drilled and connected in a closed loop. This coincides with the timeline of the net-zero goals of the city of Northampton.
Let's personalize your content